The most common reason a team shows up to a new office with no WiFi isn't a technical failure, it's a timeline problem. Internet activation and network setup both take longer than people expect, and the planning for them usually needs to start well before moving day, often before the lease is even signed.
Start the Internet Order Before You Sign the Lease
Confirming fibre availability for the specific floor you're moving into takes time, and the answer changes what happens next. If the floor already has cabling run to your suite, a typical request takes roughly two to three weeks to submit plus five to ten working days for activation. If it doesn't, the provider treats it as a new activation, and cabling has to be pulled before telecom provisioning can even start, which extends the timeline considerably. Some buildings also require facility management approval or a NOC before a technician can access service risers, so it's worth checking this as early as possible rather than finding out close to the move date.
Don't Assume Your Old Access Point Layout Will Work
A different floor plan means different walls, different distances between rooms, and different dead zones. Access point placement that worked well in the old office usually doesn't transfer directly to the new one. It's worth treating the new space as its own site survey rather than assuming the old setup, or even the old number of access points, will carry over.
Keep the Old Connection Alive Until the New One Is Tested
The way to avoid downtime isn't speed, it's sequencing. Keep the existing office's internet and network running in parallel with the new one, test wired and wireless speeds at the new location, and only move servers, switches, and staff once the new setup is confirmed working. Cutting over before testing is the single most common cause of an office opening with no connection.
| Timing | What to do |
|---|---|
| Before signing the lease | Confirm fibre availability for the specific floor |
| As soon as the lease is signed | Submit the ISP request; schedule cabling if the floor needs it |
| 2โ3 weeks before move-in | Book a site survey and plan access point placement for the new layout |
| Before staff move in | Test wired and wireless speeds throughout the space, including meeting rooms |
What to Test Before Your Team Moves In
Wired and wireless speeds at multiple points, not just near the router or the server rack. Meeting rooms, perimeter offices, and any area further from where the equipment sits are the most common places a gap shows up. It's worth running this as a dedicated check before staff arrive, rather than discovering a dead zone on the first day everyone's trying to work.
Related Reading
For scaling WiFi to a larger commercial space, see our enterprise WiFi upgrade guide; for the cabling side of a new fit-out, our structured cabling guide; and for keeping things running smoothly after you've settled in, our maintenance contract guide.
Frequently Asked Questions
Before you sign the lease, if possible. Confirming fibre availability for the specific floor takes time, and if the floor doesn't already have cabling to your suite, the provider treats it as a new activation, which takes considerably longer than a standard request. Even in a best-case scenario with existing cabling, plan on roughly two to three weeks to submit the request plus five to ten working days for activation.
No. A different floor plan means different walls, different distances, and different dead zones, so access point placement that worked in the old office usually won't work as-is in the new one. It's worth treating it as a fresh site survey rather than assuming the old setup will carry over.
Mostly, yes, with the right sequencing. The key is not cutting over until the new connection and network are fully tested: keep the old line active in parallel, test wired and wireless speeds at the new location, and only move servers and switches once the new setup is confirmed working.
Then cabling has to be pulled before telecom provisioning can start, which extends the timeline meaningfully. Some buildings also require facility management approval or a NOC before a technician can access service risers, so it's worth checking this as early as possible rather than discovering it close to the move date.
Wired and wireless speeds at multiple points, not just near the router, including conference rooms and any perimeter offices. It's worth doing this as a dedicated check before staff arrive, rather than finding out about a dead zone on the first day of work.